Goan Reporter News: Scheduled Power Shutdown for Line Maintenance on August 1st and 3rd, 2024 in Loliem

0
54

A Power Shutdown has been arranged on August 01, 2024 from 9.00 am to 3.00 pm on 11 KV Loliem Feeder for line maintenance and tree cutting work, replacement of damaged AB Switch. Affected areas areĀ Agas, Loliem Bazar, Loliem-Pollem Panchayat, Damodar school, Mohandas Lolienkar Wada, Cashew Factory, Railway Station, Gal, Pedem, Isidore side Pededm, and behind Loliem Panchayat area.

Similarly, on August 03, 2024 from 9.00 am to 3.00 pm affected areas are Dapot, Madditolop, Kajalker, Kolkona, Xendrem, Tanshi, Shelim, Polem Check Post, Polem Petrol Pump, Pollem beach area and Oscart.

LEAVE A REPLY

Please enter your comment!
Please enter your name here